Wonder Lake, IL

Champion Environmental Services, Inc has been retained by the Village of Wonder Lake, Illinois to remove an aged water tower. The structure is located in a dense region of the neighborhood; as a result, we will not “drop” the tower.

The elevated water tower will be carefully dismantled. All portions of the structure will then be methodically deconstructed on the ground for recycling.

Only our most highly skilled operators, laborers, site safety supervisors, and other associated field personnel will be mobilized for this project. Extreme care must be taken to ensure insure the protection of our workers and the surrounding community.

The effort has a very tight schedule calling for one week of on-site work.





Thursday, October 15, 2009

Demolition Video

Video of our team dropping an elevator shaft on an emergency response job; this initiative is part of an extensive demolition and asbestos abatement project. The work is being facilitated on behalf of a private client and is scheduled to finish late November.

Friday, June 12, 2009

Arcadia, Wisconsin

Champion Environmental Services, Inc. will be mobilizing in Arcadia, Wisconsin to provide demolition, asbestos abatement, and site/soil remediation services for several buildings located on East Main and South Washington streets.

Additional work scope involves the salvage of antique brick, site clearing and restoration.

Thursday, May 21, 2009

Progress At 515 East Touhy Des Plaines, Illinois

The demolition at 515 East Touhy in Des Plaines, Illinois is proceeding on schedule. The 137,400 square foot building situated on 6.14 acres is being demolished to make way for a new manufacturing facility. Champion Environmental Services, Inc. is looking to achieve a recycling rate of 97% for the client.

CESI designed approach on this project was to maximize the use of exterior walls to further inhibit dust from disturbing nearby businesses and the high traffic count on Touhy Avenue. The photographs below demonstrate the importance of proper segregation of demolition materials to maximize recycling.






Friday, April 3, 2009

Janesville, Wisconsin

A vacant commercial building in Janesville, Wisconsin is being abated of floor tile and mastic, pipe insulation, elbows/tees on pipe insulation and plaster ceiling in various locations throughout the structure. Upon completion of proper ACM removal, Champion Environmental Services, Inc. will be demolishing the 38,000 square foot structure.