At 1:30 a.m, Wednesday, October 6, Champion Environmental Services, Inc. will mobilize a team at the Cinemark Theater in Evanston, Illinois to begin removing a portion of the raised concrete flooring.
The selective demolition of the floor will help prepare the theater for the conversion to an IMAX experience. In order to accommodate the new viewing experience, the floor elevation needs to be altered. Our scope includes removal of the existing concrete ramp and raised floor. Grinding may be required to properly take out the leading edge of the slab.
Our workers will protect the surrounding area with a plastic enclosure and the area will be misted with water along with the use of negative air machines to keep the dust at a minimum.
Champion Environmental Services, Inc. is not only experienced at full building demolition as we have a division of estimators and laborers who are fully indoctrinated with the essential skill set for selective deconstruction projects.
Tuesday, October 6, 2009
Cinemark Theater Evanston, Illinois
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment