Champion was recently awarded several environmental projects in Illinois and Wisconsin. A shuttered hospital in DeKalb, Illinois will be given a clean bill of health after we remove extensive quantities of asbestos containing material. The parcel, developed in the late 60’s, reflects typical building practices which were considered prudent: The hallways and patient rooms contain contaminated floor tile and mastic throughout; carpeted office areas are held down by ACM mastic; patches of ductwork insulation throughout the second floor is “hot” and will need to be properly abated. Nearly 200,000 square feet of hospital will soon be under containment in preparation of this project.
On behalf of the Milwaukee Housing Authority, Champion Environmental Services, Inc. will be providing asbestos abatement and hazardous material removal services at an 11 story residence tower in preparation of demolition activities. ACM materials is just a portion of this contract as we are also responsible for removal of asbestos PCB bulbs/ballasts as well as mercury switches.
As part of a Job Order Contract agreement with nationwide retail chain JC Penney, Champion Environmental Services, Inc. will be abating ACM floor tile and mastic from a store in Peoria, Illinois.
Wednesday, January 27, 2010
Strong First Quarter for Environmental Work
Subscribe to:
Post Comments (Atom)
Thanks to author for this post it’s very easy to understand about the storage tank (pressure). Storage tanks are used to store hot and cold water, fuel and oil storage etc. Storage Tank- Manufacturer, Supplier and Exporter of Storage tanks in Delhi, Provides various types of storage tanks like pressure vessel, hot water storage tanks, propane storage tanks, plastic water storage tanks, fuel storage tanks and cold water storage tanks.
ReplyDelete