The scope of work involves multifaceted tasks including building demolition, asbestos abatement, selective/interior demolition, and historic salvage.
A small two story brick building approximately 4,264 square feet will be demolished. An additional three story brick building measuring 24,000 square feet will also be wrecked; various historic portions of this structure will be dismantled and preserved.
The School of Human Ecology is a five story building encompassing 76,000 square feet. All five floors will be gutted from floor to ceiling. We will also be responsible for removing/recycling the hydraulic oils from the elevators prior to demolition of the elevator.
This project should begin in the week of March 15, 2010.