Asbestos is a nocuous substance that requires a skilled methodology to prevent detrimental consequences to people and the surrounding environment. Few would recognize that many of the places people work, live, attend school, or shop are often occupying space that contain some form of asbestos.
I have yet to have a week go by on a non-related business outing where I have not been able to visually spot some form of suspect material. Be it the floor tile and window caulk of my parish school, tranite panels on a number of industrial buildings throughout Chicago, or the roof flashing on nearly every older home in my neighborhood.
To a certain degree, albeit a controversial statement - which I fully acknowledge, in most cases, ignorance in bliss during these routine encounters; left undisturbed and in good condition, many of these casual contacts with asbestos proves not harmful to person nor environment.
The pendulum swings to a differing level when our demolition crews are wrecking a building and uncover hidden asbestos. Such was the case recently during demolition in downstate Sheffield Illinois at the former Sheffield school.
Competently trained CESI personnel identified transite when breeching a wall. None of the asbestos material was broken thereby restricting the release of any asbestos.
While another company was hired to perform asbestos abatement prior to our demolition and an environmental consultant previously surveyed the entire building, the transite went unnoticed. This is not uncommon as evidenced by recent – similar situations at the Kenosha Inn and Renaissance Shell projects.
Once again, further proof that Champion Environmental Services fully adheres to our motto that “the safety of our workers and those around us will guide the decision making process.”
Showing posts with label transite. Show all posts
Showing posts with label transite. Show all posts
Tuesday, March 22, 2011
Friday, October 1, 2010
UPR Project
Champion Environmental Services, Inc. is prequalified by Union Pacific Railroad to perform asbestos abatement and demolition services across the United States. Only a handful of contractors can claim such competence – even fewer can boast of such a privileged partnership as we share with UPR.
Mobilization will begin in two weeks to abate a Chicago diesel test facility at North Pulaski and West Kinzie. The project involves the removal transite panels throughout the facility. The challenge for this project will be for our workers to maneuver aerial lifts around existing railroad tracks to gain clean access to the transit.
Mobilization will begin in two weeks to abate a Chicago diesel test facility at North Pulaski and West Kinzie. The project involves the removal transite panels throughout the facility. The challenge for this project will be for our workers to maneuver aerial lifts around existing railroad tracks to gain clean access to the transit.
Wednesday, June 24, 2009
Ottawa, Illinois Asbestos Job Finished
Champion Environmental Services, Inc., Project Manager Ralph Nordyke reports that the asbestos abatement of a shuttered bank in Ottawa, Illinois has been successfully closed out on time and without incident.
The project, taking little more than a week, included the removal of contaminated floor tile, mastic underlay, and transite. Champion Environmental Services, Inc., follows all applicable Illinois EPA rules for asbestos abatement delegated through the authority of the USEPA which enforces the National Emission Standards for Hazardous Air Pollutants (NESHAP). NESHAP regulates asbestos during demolition, renovation, and disposal.
The ACM removal was performed in preparation for demolition; the cleared land will be used to build a new Ottawa health care facility.
The project, taking little more than a week, included the removal of contaminated floor tile, mastic underlay, and transite. Champion Environmental Services, Inc., follows all applicable Illinois EPA rules for asbestos abatement delegated through the authority of the USEPA which enforces the National Emission Standards for Hazardous Air Pollutants (NESHAP). NESHAP regulates asbestos during demolition, renovation, and disposal.
The ACM removal was performed in preparation for demolition; the cleared land will be used to build a new Ottawa health care facility.
Monday, January 5, 2009
Flood Damaged Home Demolition and Abatement In Jefferson, Wisconsin
Champion Environmental Services, Inc., just completed the asbestos abatement and demolition of a flood damaged home in Jefferson, Wisconsin. The home was contaminated with asbestos containing material in the form of transite panels ; following proper removal and disposal of the ACM by certified asbestos workers, the building was demolished. The work was performed safely and efficiently taking three days to complete the project.
Labels:
asbestos,
demolition,
flood damage,
jefferson,
State of Wisconsin,
transite
Subscribe to:
Posts (Atom)